You are here

Rivierenland Tiel

Item Details

Client: Hospital Rivierenland
Year: 2017
Location: Tiel

A project with a larger size is the renovation of the emergency power installation of the hospital Rivierenland. This hospital has three clinics and has an important role in health care in the Midden Betuwe region. One of the two existing emergency equipment was out of date and had to be replaced. B&N got the contract awarded to replace the old NSA.

During the work had to guarantee the power supply to the hospital and an emergency power supply needed to be available. B&N placed two temporary Emergency generating sets. Because the controller had to be replaced, B&N also provided a temporary net-emergency control.

The new Emergency Generating set is built with a Cummins Engine and Mecc Alte generator, in addition to the reliability of this combination is the fast start-up a plus. The Emergency Generating set has a Deep Sea control module suitable for synchronization and netparallel company. The existing Emergency Generating set has been converted and equipped with DSE-control for optimal cooperation.

  • 1000 kVA emergency power generator
  • Flue gas outlet
  • Cooling air supply and drainage
  • Fuel tank
  • KIWA certificate installation
  • Factory decrease test

The Generating sets are composed of a Cummins KTA38-G5 diesel engine and a Mecc Alte ECO43-1LN generator. Control is done through the DeepSea control panel DSE8610..


Emergency power Health


Adress

Brinkmann & Niemeijer Motoren B.V.

Engelenburgstraat 45
7391 AM, Twello
Netherlands

Service & Support

Disclaimer & Privacy Statement